Before the first wall was framed on this project, some of its most important decisions were already in the ground. The footings, the foundation walls, the basement slab, and the layers wrapped around them are the parts of a house that get backfilled, poured over, and finished long before anyone moves in. They are also the parts that will sit in cold, damp New England soil for the life of the building.
This is the second post in our Building Science series, following a high-performance home and detached studio under construction in eastern Massachusetts, designed by ZeroEnergy Design. In the first post, we described the blower door test that measured the house at 0.29 air changes per hour at fifty pascals while the walls were still open. That number measures the entire envelope — and the envelope starts here, below grade.
What the ground asks of a foundation
Above grade, a wall deals with weather that comes and goes. Below grade, a foundation is in contact with damp soil every day of the year. Concrete is strong, but it is also porous. Left to itself, it draws ground moisture up and through its mass the way a paper towel draws water — what building scientists call capillary action. The ground also holds the cold in winter, and in many parts of New England it carries radon, a naturally occurring soil gas.
A high-performance foundation has four jobs: keep liquid water out, stop moisture from wicking through the concrete, hold the heat in, and keep soil gas out of the house. ZED’s drawings assign a specific layer to each of those jobs, and each one had to be installed, inspected, and covered before the next trade arrived.

Under the slab, from the stone up
Usually, a basement slab is poured over gravel and a sheet of plastic, and that is the end of the conversation. On this house, the floor of the lower level is an assembly of its own, built from the bottom up.
It starts with washed stone: four inches under the footings and twelve inches under the slab. Washed stone has no fine particles to hold water, so it works as a capillary break: ground moisture has nothing to climb. Over the stone sits four inches of Type IX expanded polystyrene, a high-density rigid insulation rated to carry the weight of a concrete floor, which separates the slab from the cold earth beneath it. Over the insulation is a 15-mil Stego Wrap vapor barrier, lapped ten inches at every seam and taped with four-inch Stego Tape, with every pipe that passes through it gasketed and taped. Then four inches of reinforced concrete.
That sheet does more work than its thickness suggests. It keeps ground moisture away from the slab, it blocks soil gas, and on ZED’s air-barrier drawings it is part of the home’s air-control plane: it wraps up the slab edge and is taped to the foundation wall with a dedicated concrete tape. The specification is plain about protecting it. No one is allowed to puncture it to drain excess water from the concrete during the pour — a shortcut it specifically rules out.
Product: Stego Wrap Vapor Barrier (15-Mil) — Stego Industries
At the perimeter, a two-inch strip of the same high-density insulation separates the edge of the slab from the foundation wall. Without it, the slab would conduct heat straight into the concrete wall and out to the surrounding ground — the cold band you can feel along the base of many basement walls in February.
The detached studio and the garage sit on slabs-on-grade, and their base is different again: ten inches of compacted foamed glass aggregate in place of foam board. The product is Glavel, made in Vermont from recycled glass. It insulates, drains freely, and carries load, and it is laid over filter fabric with a leveling course of pea stone and a second layer of fabric to protect the vapor barrier above it. The barrier there is taped with Stego Tape as well, and in the studio the sealed concrete slab is the finished floor.
The foundation walls, inside and out
Outside, the poured concrete walls are coated in Tremco Tuff-N-Dri, a fluid-applied waterproofing membrane carried to the top of the foundation walls. Over it goes two inches of Tremco Warm-N-Dri rigid fiberglass board. The board insulates the wall from the outside, and its fibers also act as a drainage mat, so water in the backfill drops down the face of the board instead of pressing against the concrete. At the bottom, interior and exterior footing drains carry that water away from the house.
Where each wall sits on its footing, a Delta Footing Barrier membrane breaks the capillary path between the two pours. Footings rest in the wettest soil on the site; the barrier keeps the moisture they pick up from wicking into the walls above.

Inside, the foundation walls are lined with two inches of foil-faced polyisocyanurate board, every seam taped. Insulated on both faces, the lower level becomes a conditioned part of the house rather than a cold room underneath it — which matters on a project where the basement holds finished rooms as well as the mechanical and electrical rooms.
Where the concrete meets the frame
The most demanding few inches of the foundation are at the top, where wood meets concrete. Concrete holds moisture, and framing should never sit directly on it. Everywhere the wood touches the foundation, the drawings call for a capillary break: pressure-treated sill plates set on a sill gasket, which also seals that joint against air. Tremco Tuff-N-Dri was also applied to the foundation shelf under the sill plate.
This is also where the air barrier crosses from one material to another. The Pro Clima membrane that wraps the walls extends down past the sheathing and is taped to the Tuff-N-Dri at the top of the foundation with Pro Clima Contega Solido Exo, a tape made for that transition and one of the six tapes in the kit we described in the first post. From there, the air-control line crosses the top of the wall at the sealed sill, runs down the taped face of the interior foam board, and meets the slab’s vapor barrier where it turns up at the slab edge. Wall to foundation, foundation to slab: one continuous line, drawn on ZED’s air-barrier sheets and measured by the blower door in July.
Product: Pro Clima Contega Solido Exo — 475 High Performance Building Supply

Just above the sill is the rim joist, the band of framing that sits on the foundation and carries the floor. The drawings require it to be insulated to a minimum of R-20, and the note on the section ends in three words: no spray foam. Usually, a rim joist gets expanding foam. Here the cavity is filled with fibrous insulation of equal value, fit by hand to the framing. It is a slower detail to build, and the specification asks for it anyway.
What comes up from the ground
Radon is a colorless, odorless radioactive gas that seeps up from soil and rock, and the U.S. Environmental Protection Agency recommends testing every home for it. The taped barrier under the slab is the first line of defense. The second is already built in: two passive vent pipes run from beneath the lowest slab up through the roof, each with a dedicated electrical circuit and room reserved for an in-line fan. If post-construction testing calls for active mitigation, the work is a fan installation, not a renovation.
The concrete itself
There is one more line in the specification that any New England homeowner will appreciate. Before the pour, the concrete supplier had to confirm that the stone in the mix is low in pyrrhotite, an iron sulfide mineral that reacts with water and oxygen and slowly breaks concrete apart from the inside. Pyrrhotite in local aggregate is behind the crumbling-foundation crisis that has affected thousands of homes in north-central Connecticut and in central and western Massachusetts. It is a question asked before the first truck arrives, and it protects the house for its entire life. The mix also includes fly ash, a supplementary cementitious material (SCM) that replaces part of the portland cement. Because cement production is the largest source of concrete’s carbon footprint, this lowers the mix’s embodied carbon. Fly ash also makes the concrete denser and more durable, and it keeps gaining strength for months after the usual 28-day mark.
Why it matters to the people who will live here
Almost none of this will be seen again. The stone, the foam, the vapor barrier, and the footing membrane are under concrete. The foundation insulation is behind backfill on one side and plaster board on the other. What the homeowners will notice is a lower level that feels like the rest of the house: dry, even in temperature, and free of the damp, musty air most of us associate with a basement.
Ultimately, a foundation built this way supports everything above it — our client’s comfort and health in a quiet, durable and energy-efficient home for years and generations to come.
In the next post, we come up out of the ground and into the wall: four inches of compressed wood fiber over a vapor-open membrane, with dense-packed cellulose in the stud bays, and why ZED designed a wall that is able to dry. Stay tuned…
If you are planning a home in New England and want to understand what a build like this requires — the team, the schedule, and the budget — we would be glad to hear from you.
Merz Construction is a high-end custom residential builder serving Greater Boston, Metrowest, and the Northwest Suburbs.